During the year 2005 & 2006 some major orders booked and executed viz 

 

 

 

Industry Location
MW

Indal

Sambalpur

100 MW

Arkay power plant

Ramnad 59 MW

Aban power plant

Kutthalam

50 MW

Aarthi steel

Cuttack

40 MW

Bushan steel

Jharsuguda

40 MW

JK cements

Rewa

29 MW

Birla cements

Chitturgarh

27 MW

Birla cements

Satna

27 MW

Vandana global power

Raipur

40MW

Jindal steel plant I

Thorangal,Bellary

100MW

Jindal steel plant II

Thorangal,Bellary

100MW

Shree cements

Bewar 6MW
Hindustan zinc Ltd
Chitturgarh

8MW

R.K Powergen pvt Ltd

Hiriyur 25MW

Sterlite industries p Ltd

Tuticorin

8MW

Khanna papers Ltd

Amrister 19MW

Essar refineries

Surat  

Aurobindo agro Energy pvt ltd.

Sivagangai

2 x 8.5 MW

Jagadamba power & Energy Ltd.

Siltara, Chattisgarh

25 MW

Godavari Powers Ispat Ltd.

Siltara, Chattisgarh

25 MW

Sriram Powers

Dindugal  

SISCOL

Salem

2 x 30 MW

 

 

 

 

  • Indian oil corporation Ltd – Mathura
  • Indian oil corporation –Rajasthan
  • ONGC – GCS Project, Kovilkalapal (TN)
  • TNEB - Natural gas pipe line project, Kuthalam, Tamilnadu.

 

 

 

 

 
  • Hindustan zinc ltd- chitoorgargh- Rajasthan
  • Viniti organic chemicals –Chiplun, Maharashtra.
  • Alagar resins – Madurai, Tamilnadu ( Automation project)

 

 

 

 

Sewage & Water treatment plant – Bangladesh,Suma cements

 

 

 

  • Water Treatment Plant Khouzastan Steel company,Mansen Engineering, Chennai, India.
  • Preparation of Logic diagram, Instrument location layout, JB Layout, Cable tray routing, Cable Schedule & JB schedule for M/s Aquatherm Engineering consultant (I) ltd.
  • Preparation of Pre-bid documents for STP–Tawi Oman.
  • Detail Engineering for HRSG 65TH BOILER GB Engineering Trichy.
  • Preparation of Pre-bid documents for NLC 2x250 Cooling water system.
  • Preparation of data sheet for IOCL –Rajasthan-Gas pipe line project for Aban construction.